Total No. of Flats
No. of Floors
- 2 Basements + Gr. + 27 Fl.
No. of Flats per Floor
- 4 Nos. (ALPHA) | 8 Nos. (BETA & GAMMA)
No. of Lifts per Block
- 4 Nos. in ALPHA (13 PASSAGENGERS EACH)
- 5 Nos. in BETA & GAMMA (13PASSAGENGERS EACH)
- External Door- MS Painted.
- Internal Car-Stainless Steel Wall & Granite Stone Flooring.
- Speed – 2m/second
1. Entrance Lobby Of Blocks
a) Alpha
I. Ground Floor Entrance Lobby Area- (232.00 sq.mt. / 2497.24 sq.ft.)
II. Lower & Upper Basement Lobby Area- (181.00 sq.mt. / 1948.28 sq.ft. each)
b) Beta & Gamma
I. Ground Floor Entrance Lobby Area-(315.00 sq.mt. / 3390.66 sq.ft.)
II. Lower & Upper Basement Lobby Area- (260.00 sq.mt. / 2798.64 sq.ft. each )
c) Flooring – Marble / Vitrified Tiles
d) Ceiling - POP False Ceiling / Grid False Ceiling
e) Painting – Plastic Paint
f) Lift Facia – Stone / Tiles
g) Lighting – Ceiling Mounted Light Fixtures
h) Door – S.S Doors/ Aluminium Doors
2. Staircase
a. Flooring - Marble Stone Flooring (Staircase No-1) Concrete / IPS Flooring (Staircase No.2)
b. Painting - OBD Paint.
c. Railing - MS Railing
d. Lighting - Ceiling Mounted Light Fixture/Tube Lights
3. Terrace
a) Flooring – Tiles / Trimix Concretev
b) Painting – Texture Paint
c) Parapet – R.C.C / M.S Railing
d) Water Tank – R.C.C
4. Visitor’s / Differently Able Toilet
a) One for each block.
b) Flooring - Tiles.
c) Painting - OBD.
d) Wall Cladding - Tiles.
e) W.C. - European WC.
f) CP Fittings - Chrome Plated.
5. Basement Area – Lower & Upper Basement.
Road & Parking - Trimix Concrete Flooring.
b) Lighting - Ceiling Mounted Light Fixture.
c) Normal Parking size – 13.75 sq.mt. (2.50 X 5.50 MT.)
d) Back to Back parking – Small – 22.50 sq.mt. (2.50 x 9.00 MT.)
Large- 27.50 sq.mt. (2.50 x 11.0 MT.)
6. Visitor Parking
- 2 nos.Visitors golf cart at entrance gate.
- 15 Visitors Parking for each Block in Basement.
- 2 Disable person parking for each Block in Basement
7. Club - Approximate Area- 2285.00 sq.mt. / 24595.74 sq.ft. (Including
Party lawn and Terrace) Consist of:
A. DOUBLE HEIGHT 23’-0” high (7.20 mt.) Reception Lobby
- Flooring – Vitrified Tiles / Marble Stone
- Ceiling – Pop False Ceiling/ Grid False Ceiling
- Walls – OBD Paint/Wall Paper
B. AV ROOM
- Flooring – Vitrified Tiles / Marble Stone
- Ceiling – Pop False Ceiling/ Grid False Ceiling
- Walls – OBD Paint/Wall Paper
C. Community Hall with Pantry & male/female toilet and party lawn.
- Flooring – Vitrified Tiles / Marble Stone
- Ceiling – Pop False Ceiling/ Grid False Ceiling
- Walls – OBD Paint/Wall Paper
D. Gym - 1 No.
- Cardio area
- Weight training area
- Pilates area
- Yoga and aerobics area
- Flooring – Vinyl / Rubber Flooring
- Wall – Mirror / OBD Paint / Wall Paper
- Ceiling – Perforated Gypsum Tiles / POP False ceiling
- Equipment - Treadmill-4 No., Bikes-4 No., Benches-4 No., Dumble with Rack-2 Sets, MultiPress-1 No., Leg Press-1 No., Handpress-1 No., Pilate- 1 nos.)
E. Teenager Room
- Virtual golf area
- Pool table
- Gaming zone
- Flooring – Vitrified Tiles / Marble Stone
- Ceiling – Pop False Ceiling/ Grid False Ceiling
- Walls – OBD Paint/Wall Paper